During a renovation the walls and ceilings are open, which makes it the perfect moment to renew the electrical installation and prepare the lighting exactly where you want it.
Wiring in walls and ceilings
New partition walls get boxes for switches and sockets before the plasterboard is finished. In the ceiling, cables run between the battens to the positions of the new lights. Old wiring is replaced, so the whole installation is safe and up to date.
The finished result
After plastering and painting, the switches, sockets and lights are fitted. In this hallway, recessed spots give even light along the full length, without visible cables or fittings hanging from the ceiling.
Plan the lighting first
The positions of lights, switches and sockets should be decided before the walls are closed. That is what a lighting plan is for. See our lighting plan service and the full renovation service.





